Skip to primary navigation Skip to content Skip to footer
Back to Newport Fishing Updates

Long Leader Bag Limits Increase to 15 Rock Fish March 1st 2023

a couple of people that are standing in the water
UPDATE: LONG LEADER BAG LIMIT INCREASES TO 15 FISH ON MARCH 1ST.
We offer an 8 hour long leader rock fish trip. The price is $165 per person and you can add crabbing for $25. Call the office to book your trip.
The ODFW released the following:
Offshore long leader gear fishery bag limit increases to 15 fish per day beginning March 1
The recreational offshore long leader gear fishery daily bag limit will be increasing from 10 to 15 fish per day beginning on Wednesday, March 1, 2023.
ODFW staff worked with our federal partners to allow this additional opportunity for anglers on healthy rockfish stocks. The increased bag limit may also help take some pressure off nearshore rockfish species, such as black, copper, and China rockfish.
The long leader gear fishery targets healthy underutilized midwater rockfish stocks such as yellowtail and widow rockfish. To participate in the long leader gear fishery, anglers must be outside of the 40-fathom regulatory line and have a minimum of 30 feet between their weight and the lowest hook with a non-compressible float above the hooks. This helps keep the gear away from yelloweye rockfish. The 15-fish bag limit applies to 10 species of midwater rockfish only (yellowtail, widow, canary, redstripe, greenstriped, silvergray, chilipepper, blue, deacon, and bocaccio rockfishes). Other bottomfish, including lingcod, are not allowed with longleader gear fishing.
More information on the longleader gear fishery can be found at:
  • Posted in:
Full Day Long Leader Rockfish From $220

The long leader fishery was developed as an option to fish for species of rockfish that we don’t normally access on traditional bottom fishing trips. This style of fishing requires a 30 ft. leader with a non-compressible float. We target shelf rockfish species including Yellow Tail, Widow Rock Fish, Canary, Bocaccio and Silver Grey’s and more. The bag limit is 10 rockfish per person. No lingcod can be retained on this trip.